16/03/05 Floor
tiles in the lounge
|
 |
22/03/05 Kitchen
furniture delivery arrives
|
|
Loads of it!
|
|
Stacked in the
dining room
|
|
Starting
to build the unit carcasses |
|
Integrated fridge carcass
|
|
|
The layout takes shape
|
 |
Unit carcasses all in place ready to
be fixed
|
|
29/03/05 Fixing
oven housing ....
|
|
... and installing oven
|
|
Adding
wall units |
|
Wall of units fixed with fridge and
oven installed
|
|
|
07/04/05 Spiral
staircase arrives
|
 |
Bonding the centre pole to the hall
screed
|
|
Stair landing
|
|
American oak stair treads
|
|
Assembling
treads |
|
Sliding the bottom tread onto the
pole
|
|
|
Second tread joins the first
|
 |
Treads are arranged around the pole
|
|
Waiting for the handrail to be
assembled
|
|
Landing with balustrade
|
|
Handrail
is added |
|
From the top
|
|
|
Cloakroom furniture (the doors will
be white - the green is protective film!)
|
|
Guest bathroom furniture
|
|
Shower bath
|
|
The first consumer unit is installed
|
|
Circuits completed
|
|
Tails
connect the power
|
|
|
Second unit installed
|
|
Utility room units being installed
|
|
Wardrobes in bedroom 2
|
|
25/04/05 Doors
and appliances added to carcasses
|
|
Area
which will have the sink, hob and dishwasher
|
|
Oak steps from the dining room to
the lounge
|
|
|
03/05/05 Guest
bath waste & overflow attached
|
|
Framing for bath in master bath
being constructed
|
|
Guest bath in place
|
|
Wardrobes in bedroom 3
|
|
Wardrobes in bedroom 2 - Ikea Pax
have been cut down to fit
|
|
Platform spanning joists to spread
the weight of the tank over 2 joists
|
|
|
Kitchen cupboard lights added
|
|
Lounge/dining steps oiled ¿
|
|
09/05/05 Framing
for the master bath
|
|
Water resistant MDF added for
side/end panels
|
|
... and to the top frame
|
|
The top is tiled ...
|
|
|
... and the bath is now ready for
the bath to be inserted once the plumber has completed pipework to the
shower ¿
|
|
16/05/05 Staircase
taken apart to install new tread supports
|
|
Max can't believe we'll ever move in
so he's getting ready for cardboard city!
|
|
Installing wardrobe carcasses in the
master bedroom
|
|
At this point we discovered a large
gap between carcass and wall, so they were uncoupled and we started
again!
|
|
But eventually we got them right
....
|
|
|
... and now we just have to add the
doors
|
|
The bath has been put in place ...
|
|
... ready for the plumber to add
pipework. ¿
|